ElectriCare installs Level 2 EV chargers throughout Wildomar's rural and suburban neighborhoods — from Canyon Hills to Bundy Canyon. Tesla Wall Connector Preferred Installer, ChargePoint Certified, and licensed electrical contractor (CSLB #778366). We handle City of Wildomar permits.
Every installation we perform is permitted, inspected, and code-compliant. Skipping a permit risks denied insurance claims, a voided vehicle warranty, and liability when selling your home. If another company offers to skip the permit to save time or money — that is a red flag.
Wildomar's hot, dry summers and abundant sunshine create ideal conditions for solar energy generation while simultaneously increasing air conditioning loads on residential electrical systems. Since 2000, ElectriCare has served homeowners throughout the 92595 area, providing expert electrical upgrades that meet the growing demands of modern living. As more residents transition to electric vehicles, our team specializes in EV charger installation that integrates seamlessly with existing home electrical panels, ensuring safe and efficient charging without overloading circuits. We frequently work in neighborhoods near Marna O'Brien Park, where many homes benefit from comprehensive system inspection services to verify their electrical infrastructure can handle both vehicle charging and battery storage solutions. Our licensed electricians understand Wildomar's unique combination of newer developments and established properties, tailoring each installation to meet specific household needs while maintaining compliance with local codes and utility requirements for reliable, long-term performance.
The City of Wildomar's Building and Safety Department processes electrical permits, including Level 2 EV charger installations, through electronic submittal only — applications aren't accepted at the counter, only by email to the Building Permit Team. As of March 2026, the city also requires residential solar permitting to run through Symbium, an online platform designed to speed up code-compliance review; while that requirement is specific to solar, it reflects the direction Wildomar's permitting process has been moving, and ElectriCare stays current on these requirements so your EV charger application doesn't get delayed by an outdated submission method. For Wildomar's larger acreage properties, we also routinely evaluate whether a subpanel near a detached garage or barn makes more sense than a single long circuit run from the house panel.
From Tesla Wall Connectors to panel upgrades, we handle every aspect of your EV charging installation
Tesla Wall Connector Preferred Installer. Hardwired 60-amp circuits for maximum charging speed—up to 44 miles of range per hour.
ChargePoint Certified installer. Adjustable amperage (16A-50A) to match your panel capacity. WiFi connectivity for scheduling.
Upgrade from 100-amp to 200-amp service. Includes SCE coordination, permit, inspection. Federal solar tax credit (30%) applies if bundled with solar.
Budget-friendly option for mobile EV chargers. Code-compliant installation with dedicated 50-amp circuit, permit, and inspection.
Two EVs? We install dual charger setups with load-sharing technology. Both chargers operate simultaneously without exceeding panel capacity.
Pair your charger with rooftop solar to charge with $0 fuel cost. System sized for home consumption and EV charging demand.
Electrical expertise specific to your community's infrastructure
Master-planned suburb on Wildomar's edge with more consistent modern construction. Most homes have 200-amp service, supporting straightforward Level 2 charger installs without upgrades.
Mix of newer construction and larger rural parcels along Bundy Canyon Road. Properties here often have longer driveways and more detached structures, so conduit runs and sub panel evaluations come up more often than in tract neighborhoods.
Established community with a mix of manufactured and site-built homes. Panel ages vary; we evaluate individually rather than assuming a standard capacity.
Newer residential development with more standardized 200-amp service, generally supporting same-day garage installs.
Wildomar has a meaningfully higher share of horse properties and larger lots than neighboring cities. These installations frequently involve evaluating whether to extend from the main panel or add a dedicated subpanel near a barn, workshop, or detached garage.
Certified, licensed, and local—serving Wildomar since 2000
We're a Tesla Wall Connector Preferred Installer and ChargePoint Certified installer—two of the most trusted EV charger brands.
Every installation is performed by CSLB-licensed electricians on our payroll—never subcontractors.
ElectriCare pulls the electrical permit, submits load calculations, coordinates the final inspection, and handles utility notifications.
We help navigate HOA architectural reviews and cite California Civil Code § 4745 when needed to ensure approval.
Free electrical panel evaluation to determine if your existing service can handle the charger load or if an upgrade is recommended.
All installations backed by our industry-leading workmanship warranty. We've been licensed in CA since 2000—CSLB #778366.
"Work was done quickly and professionally. There was good communication throughout our solar project. System is working great! Electricare has been very responsive to all of our inquiries."
"The duty of care, guidance and workmanship that they gave was top notch. They worked swiftly with the city planning dept and Edison and got us up and running within a month. We are extremely happy with the results!"
"Alex was awesome! I called him about issues I’ve been having with my solar system and he came out same day and immediately knew what was wrong and made immediate changes that he could. He is very knowledgeable and professional."
Not always—many homes built in the 1980s and 90s throughout Wildomar have 200-amp panels that can accommodate a Level 2 charger without a full upgrade. We'll assess your current panel capacity and load during the site visit to determine if you need a subpanel or if your existing setup can handle the new circuit. In some cases, a simple breaker addition is all that's required, keeping installation costs in the $1,299-$1,600 range.
A 48-amp charger delivers about 11.5 kW compared to 7.7 kW from a 32-amp unit, which means roughly 50% faster charging times for your EV. If you have a longer commute or frequently drive around Riverside County, the faster charging can be worth it. However, 32A is perfectly adequate for most Wildomar residents who charge overnight and drive typical daily distances.
While Wildomar falls under different utility territories depending on your exact location, we'll provide all the documentation you need for rebate applications, including itemized invoices and installation certificates. We can guide you through the process and answer questions, though homeowners typically submit the applications themselves. Many of our customers successfully claim the federal tax credit and any available utility incentives after installation.
Both options work well, but hardwired units are generally more secure and weather-resistant for Wildomar's hot summers. Plug-in chargers using a NEMA 14-50 outlet offer flexibility if you want to take the charger with you when you move or swap it between vehicles. We'll help you decide based on your specific situation during the consultation, and either option typically falls within the $1,299-$1,600 installation range.
This is common in Wildomar homes with pools and multiple AC units running during our warm months. We can install a load-sharing device or dedicated subpanel to safely add your EV charger circuit without overloading your main panel. In some cases, smart chargers with load management features can automatically adjust charging rates based on your home's current electrical demand.
Use our free load calculator to find out in two minutes — no electrical knowledge required. It runs the California Electrical Code calculation and tells you exactly where you stand before you commit to anything.
Your minimum required panel size is determined by your total electrical load — not just your panel size alone. The calculator checks this against California code in real time.
Answer a few quick questions below and we'll email your detailed Wildomar EV charger installation quote right away — no waiting for a callback.
ElectriCare handles everything — city permits, panel upgrades, and professional installation by licensed electricians, even on larger acreage and equestrian properties. Get a free quote today.